Rural Electrification through Renewable Energy (ELREN)
July 2017 - 2020
Energy & Renewable Energy
GIZ
Around 20% of Indonesia’s population (50 million people) are currently still without access to a secure power supply. The Government of Indonesia has set the objective of increasing the electrification rate to 96.6% by 2019. Many villages are located far from electricity grids and for the foreseeable future have no chance of connecting to the state electricity grid. Off-grid electrification through renewable energy (RE) is of particular importance here and makes it possible to reduce greenhouse gas emissions compared with the use of diesel-powered generators.
The project objective is: Knowledge about using renewable energy for off-grid electrification is institutionalised.
The project is active at different intervention levels. It provides advisory support on capacity development for the Directorate-General of New
Renewable Energy and Energy Conservation (EBTKE) on defining standards for the quality and scope of performance for off-grid electrification programmes and on monitoring and evaluating existing systems. This will allow EBTKE to take on a technical leadership role vis-à-vis other ministries and thus support coordination of the different measures taken by the Indonesian Government with regard to off-grid electrification through RE. The qualitative and the quantitative capacity of the private sector to construct and maintain RE systems for off-grid electrification is increased at the same time.
The project aims to collect and process relevant knowledge about off-grid electrification through renewable energy and to institutionalise this among the relevant public and private sector actors (module objective). This contributes to avoiding future greenhouse gas emissions and providing reliable electrification of additional households. In addition, the project builds capacities at the individual level among key actors, particularly at EBTKE, other ministries, and in relevant parts of the private sector. The project objective is: Knowledge about using renewable energy for off-grid electrification is institutionalized.
ASEAN Center of Energy ACE – Internal Team Building
February 2020 - April 2020
Energy & Renewable Energy
GIZ
ASEAN Center of Energy ACE – Internal Team Building
February 2020 - April 2020
Energy & Renewable Energy
GIZ
The ASEAN-German Energy Program (AGEP), a jointly implemented program by ASEAN Centre for Energy (ACE) and Deutsche Gesellschaft fur International ZUSAMMERNARBEIT (GIZ), supports ACE to strengthen its strategic role as a regional competence central of excellence for sustainable energy in the ASEAN region. This second phase of the joint program, AGEP II, has 3 main areas to contribute to APAEC 2016-2025:
Support ACE to provide innovative services to promote sustainable energy.
Improved collection and digital processing of socio-economic and energy data in AMS.
Implement selected actions of ACE’s organizational development plan.
ACE personnel need to be ready to work in the new assigned area and provide quality work for team achievement. To prepare for the incoming challenges, it is essential for all of ACE personnel, regardless of the department, to first have a common mindset in achieving new goal for the Organization.
To comply with this, ACE needs to have a team building activity which can be a good opportunity to enhance communication and coordination.
Sustainable Regional Economic Growth and Investment Programme (SREGIP): Resource Efficiency and Cleaner Production in hotels in Lombok
AMC has been awarded this project under the GIZ- Sustainable Regional Economic Growth and Investment Programme (SREGIP). SREGIP has established a joint initiative with the Ministry of Tourism, BAPPENAS and local authorities in NTB Province to promote Sustainable Tourism in Lombok. One of the activities is the promotion of resource efficiency of hotels through local service providers. In this project AMC provides training and consultancy for improving the efficiency and overall business competitiveness of hotels with measurable effects on cost. The hotels are audited regarding resource efficiency and cleaner production. Local service providers are trained on hotel CP and RE audits to enable them for further audits in the future. The hotels are supported during their implementation of CP and RE and the improvement is monitored.
Sustainable Regional Economic Growth and Investment Programme (SREGIP): Resource Efficiency and Cleaner Production in hotels in Lombok
March 2016 - May 2017
Energy & Renewable Energy; Environment & Sustainability; Good Goverment & Institutions
GIZ - GFA
Sustainable Regional Economic Growth and Investment Programme (SREGIP): Resource Efficiency and Cleaner Production in hotels in Lombok
March 2016 - May 2017
Energy & Renewable Energy; Environment & Sustainability; Good Goverment & Institutions
GIZ - GFA
AMC has been awarded this project under the GIZ- Sustainable Regional Ekonomis Growth and Investment Programme (SREGIP). SREGIP has established a joint initiative with the Ministry of Tourism, BAPPENAS and local authorities in NTB Province to promote Sustainable Tourism in Lombok. One of the activities is the promotion of resource efficiency of hotels through local service providers. In this Project AMC provides support to the association of Engineers of Lombok (ACE). ACE is supported in developing a strategy and work plan to enhance the efficiency and overall business competitiveness of hotels with measurable effects on cost. The capabilities of engineers of hotels in Lombok are improved by training and training on the job on eco hotel auditing. The hotels are audited regarding resource efficiency, energy efficiency, cleaner production, and PROPER issues. ACE is supported regarding following activities:
Development of a strategy for these association for the mid-term and an action plan for the coming year
Keep the association into contact with suppliers of environmentally friendly equipment, especially energy saving equipment
Use of ecolabels and energy labelling for selecting products
Provide training to engineers of the hotels on environmentally friendly technologies
Introduction of ESCO companies to hotel managers and owners
Compile lessons learnt for other hotels and hotel associations
Develop a dissemination strategy for other areas to implement eco hotel management
National Consultant Resources Efficiency Program in Lombok.
October 2015 - May 2016
Energy & Renewable Energy
GIZ
National Consultant Resources Efficiency Program in Lombok.
October 2015 - May 2016
Energy & Renewable Energy
GIZ
GIZ SREGIP has established a joint initiative with the Ministry of Tourism, BAPPENAS and local authorities in NTB Province to Promote Sustainable Tourism in Lombok. One of the activities is the promotion of resource efficiency of hotels and other service providers of the tourism industry, such as restaurants and spas. Objectives of the project were:
Improving the efficiency and overall business competitiveness of hotel/other tourism businesses with measurable effects on costs by:
1. Reducing water, electricity, and diesel fuel consumption.
2. Improving the efficient usage of other raw materials, such as detergent, soaps and utilities.
3. Reducing landfill waste
4. Reducing overall impact on the environment, reducing carbon footprint.
Improving the internal services of AHM (ASOSIASI HOTEL MATARAM) on perpetuating and potentially replicating a Resource Efficiency Program.
Enabling and facilitating follow up by a local service provider.
Initialing the positioning of new service providers in RE Program.
Workshop on Metrology in Chemistry
May 2015 - June 2015
Energy & Renewable Energy; Special Issues
Physikalische Technische Bundesanstalt (PTB)
May 2015 - June 2015
Energy & Renewable Energy; Special Issues
Physikalische Technische Bundesanstalt (PTB)
PTB is planning to perform a project in Indonesia on Metrology in Chemistry in cooperation with LIPI and other partners. AMC has supported PTB in conducting a planning workshop to determine goal, objectives, targets for the whole project under special consideration of the first project phase